« Back to News

UVA Hospital Expansion

06/10/2019

The Century team employed numerous innovative construction processes during the UVA Hospital Expansion project in conjunction with Skanska! Check out this time-lapse video of the hydraulic self-climber performing lift #6 (of 15 total lifts) on Core A-B, which encompasses 3 elevator cores and 1 stair core. The 30 second clip captures the 14' lift over approximately 30 minutes (real-time).